Our Customers
   
 


Trek Bikes

Designs greener bikes faster with unified DS PLM platform for composites

Challenge:

To remain the leader in the highly competitive bike industry, Trek Bikes
needs to get unique frame designs of superior durability and quality to
market in less time than ever before.


View Case Study and Solution


Viking Range

Cooking up culinary excellence with DS PLM

Challenge:

  • Develop more innovative products to maintain market leadership and customer loyalty.
  • Shorten development time to meet rapidly evolving customer demand
  • Increase synergies and eliminate redundancies amount different product teams
  • Reduce lead times for custom solutions.


View Case Study and Solution        See Video


Royal Canadian Mint

Accelerating the pace of innovation with V5 PLM and
Microsoft® Server Product Portfolio

A-dec Objectives:

  • Develop new products at a faster pace
  • Engineer products right the first time

View Case Study and Solution


ACT Aerospace

Cuts detailed design time 90% with CATIA for Composites

Challenge:

When ACT Aerospace used manual methods for detailed composite design, issues such as wrinkling and warping during layup required design changes that lengthened cycle times.

View Case Study and Solution


A-dec

Automating dental cabinetry design and production
with V5 PLM and Microsoft .NET

A-dec Objectives:

  • Eliminate production-system limits on manufacturing capacity
  • Reduce errors by eliminating data re-entry at key transitions
  • Improve customer service by reinstating custom order capability
  • Capture “tribal knowledge” to improve accuracy and process control

View Case Study and Solution


C&D Zodiac

Leveraging knowledge corporate-wide with DS PLM

Challenge:

Identify and eliminate bottlenecks and hidden costs to minimize product development costs and support a highly competitive pricing structure.

View Case Study and Solution


Die Cad Group

Stamps out wasted time with CATIA V5

Challenge:

To design increasingly complex tooling while competing with low-wage offshore suppliers, Die Cad needed an efficient, powerful solution to cut costs by cutting time.

View Case Study and Solution


Héroux Devtek

Collaboration with V5 PLM lands better design solutions

Challenge:

To maximize the opportunities created by close collaboration between engineering and manufacturing, Héroux Devtek needed to bridge the physical distance between the two groups.

View Case Study and Solution


Triumph Composite Systems

Engineering efficiency soars by up to 30% with DS PLM

Challenge:
Triumph Composites wanted to increase engineering productivity by reducing the time required to locate the latest version of files and manage manual, paper-based processes.

View Case Study and Solution


GID Development Corp.

GID models multiple 3D design options in a fraction of the time previously required...helping to nearly double profit margin per project.

Challenge:

GID Development Corp. needed solutions powerful enough to design a wide range of complex products quickly, and accurately convey the designs to overseas factories for right-first-time manufacturing.

View Case Study and Solution

 
   
 
Contact Us